Skip to main content
Decision guide // Design and Build Factory

Design and Build vs Separate Architect and Contractor

Design and build vs separate architect and contractor: responsibility, coordination, timing and when each suits.

· 5 min read

Owner, architect and contractor meeting around factory drawings in a site office

Two Ways to Procure a Factory

If you own industrial land in Selangor, you’ve probably hit this fork already: design and build or traditional? It looks like a paperwork choice. In practice, it decides who carries the risk.

Factory Builder Malaysia is the factory and warehouse building arm of QDB Ventures Sdn Bhd, a Cheras-based contractor that builds in Selangor. We offer design and build, so we’ll be upfront about that. You’ll also see where the other route fits you better.

There are two main routes to getting a factory built. In the traditional route, you appoint an architect and engineers to design the building, then tender the design to contractors. In design and build, one contractor handles both design and construction under a single contract.

Both work. Each suits different owners. If you are weighing up our design and build factory service against appointing your own designers, this comparison helps.

Below, we compare responsibility and timing, set the two routes side by side, then show which owners suit which route.

Single Responsibility vs Separate Appointments

Under design and build, one party answers for the whole building. If something in the design does not work on site, it is the contractor’s problem to solve.

Malaysian contract wording backs this up. A Pertubuhan Akitek Malaysia (PAM) presentation on the PAM 2006 form explains that the contractor’s design duty is reasonable skill and care, and that for design and build it becomes “fit for its purpose”. That is a higher bar, and it sits with the contractor.

Under the traditional route, responsibility is split. The designers answer for the design, the contractor for building it. When a problem sits between the two, sorting out who pays can take time.

Engineer explaining a structural drawing to a factory owner on site

Some things stay the same whichever route you pick:

  • A Principal Submitting Person (PSP) is still needed. According to a Board of Engineers Malaysia circular, only a professional architect, a professional engineer with a practising certificate, or a registered building draughtsman can act as PSP and submit building plans to the local authority.
  • The PSP signs off at the end. The same circular says the PSP issues the Certificate of Completion and Compliance (CCC) together with all 21 Form Gs (G1 to G21).
  • Payment disputes are covered. A 2025 DLA Piper briefing notes that the Construction Industry Payment and Adjudication Act 2012 (CIPAA) applies to written construction contracts for work in Malaysia, and parties cannot contract out of it.

Pro tip: Ask any contractor or architect, in writing, who will act as PSP on your factory. It’s a simple question, and it shows you quickly how a team has organised itself.

Coordination and Timing

Design and build is usually faster, because the design team and the builders work together from the start. Buildability questions get answered during design, and some stages can overlap.

Under the traditional route, the design is usually completed before contractors price it. That gives a clear basis for tenders but adds a tender stage and can mean redesign if prices come in high.

The Malaysia chapter of the Mondaq construction comparative guide sums up the trade-off like this:

  • Traditional: you keep full control and have time to review and correct the design, but the project can take longer because design must finish first.
  • Design and build: the duration is shorter, which can reduce project costs, but you have less control and changes can crop up along the way.
  • The common worry: the same guide lists design and build as strong on cost and time but weaker on quality.

You can close that quality gap on paper. Insist on a written specification and a clear list of inclusions and exclusions before you sign.

Side-by-Side Comparison

Here is the short version. Use it to find the rows that matter most to you.

FactorDesign and buildSeparate architect and contractor
Who is responsible for designContractorYour designers
Number of main contractsOneSeveral
Owner’s coordination effortLowerHigher
Control over designersThrough sign-offs and specificationDirect
Ability to overlap stagesHigherLower
Separate tender stageNot neededYes
Basis for comparing pricesContractor proposalsSame design, several tenders
Typical trade-off (Malaysian practice)Faster, less owner controlMore control, usually slower

If you compare design and build vs traditional contract quotes, check that every bidder prices the same scope. Contractor proposals can differ in what they include, so line them up item by item.

There is no wrong route, only a wrong fit

The right choice depends on your experience, how much coordination you want to do, and whether you already have a design.

When Each Route Suits

Design and build suits owners who want one point of contact. The traditional route suits owners who want to steer the design themselves.

Design and build often suits you if:

  • You have land and a clear need, but no drawings
  • You want one party responsible for the whole job
  • You would rather not coordinate several consultants yourself

The traditional route often suits you if:

  • You want direct control over the design team
  • You already have a trusted architect or engineer
  • You want several contractors to price the same design

Whichever you choose, a Selangor factory goes through the same approvals. According to FactoryHub’s 2026 approvals guide, the land must be in the industry category, and the local council must grant planning permission (Kebenaran Merancang). It must also approve your building plans through its One Stop Centre (OSC).

Fire rules can shape your design early. The same guide says Bomba requires an annual fire certificate for designated premises, such as a sprinklered single-storey factory of 2,001 m² or more. If your building is near that size, ask your designer or contractor how they will handle Bomba plan endorsement.

Owners Who Already Have Drawings

If you already have architect or engineer drawings, you do not need design and build. A build-from-drawings arrangement lets a contractor review your drawings, confirm the building works needed and price them.

Check your set before you send it. FactoryHub’s guide says council building plan approval needs architectural, structural, M&E and fire drawings. A set missing one of those will cause delays later.

Send your drawings with the brief through our contact page and our engineers will review them and prepare a quotation with inclusions and exclusions.

Next Step

Choosing between design and build vs traditional contract comes down to how much of the coordination you want to own. Start with your site, your drawings (if any) and your appetite for managing consultants.

To understand exactly what the design and build route includes, read what a design and build factory contract covers. To see the stages, read the design and build process.

Still unsure which route fits your land? Send us your lot details and any drawings, and we’ll tell you honestly which way we’d go.

Quick answers

Frequently Asked Questions

Which route is faster?

Design and build can be faster because design and construction planning overlap under one team. But timing still depends on the project, the approvals and how quickly decisions are made.

Who is responsible for design errors?

Under design and build, the contractor is responsible for the design as well as the construction. Under the traditional route, the designers are responsible for their design and the contractor for building it.

I already have drawings. Which route?

A build-from-drawings contract, where the contractor prices and builds your existing design. Send the drawings with your brief and we will review them.

Which gives me more control over design?

The traditional route gives you direct control over the designers. Design and build keeps control through sign-off points, written specifications and written variations.

From guide to project

Learn more about Design and Build Factory

One contract covering design, engineering and construction for owners who have industrial land but no drawings yet. Every quotation lists inclusions, exclusions and responsibilities.