# Factory Construction Guides | Factory Builder Malaysia

> Plain-English guides to building a factory or warehouse in Selangor: cost drivers, approvals and CCC, design and build, extensions, M&E and site works.

URL: https://factorybuilder.my/guide/

menu\_book Guides from our engineers

# Factory Construction Guides

Straight answers to the questions owners ask before they commit: what drives cost, which approvals you need, how design and build works, and what to decide early. No sales talk, no made-up prices.

## Planning, Approvals and Cost

The big questions owners ask before building a factory in Selangor.

Decision guide

### After Handover: Defects Liability, As-Built Drawings and Future Extensions

After factory handover: defects liability, who fixes roof leaks or floor cracks, the documents you get and planning to extend.

[After Handover: Defects Liability, As-Built Drawings and Future Extensions →](/guide/after-factory-handover/)

Decision guide

### Build, Buy or Rent a Factory: How to Decide

Renting, buying ready-built or building on your own land: fit to your production line, control, timing and a checklist.

[Build, Buy or Rent a Factory: How to Decide →](/guide/build-buy-or-rent-factory/)

Explainer

### Can You Build a Factory on Your Land? Zoning, Setbacks and Plot Ratio

Check whether your land suits a factory: light, medium and heavy industry zoning, setbacks, plot ratio and when to ask the local authority.

[Can You Build a Factory on Your Land? Zoning, Setbacks and Plot Ratio →](/guide/build-factory-on-your-land/)

Decision guide

### Detached vs Semi-Detached Factory: Land, Setbacks and Layout

Detached or semi-detached factory: land and setbacks, access and loading around the building, and room to extend.

[Detached vs Semi-Detached Factory: Land, Setbacks and Layout →](/guide/detached-vs-semi-detached-factory/)

Explainer

### Factory Building Approvals in Selangor: From Planning Permission to CCC

The approval path for a new factory in Selangor: planning permission, building plan approval, OSC submissions and the CCC at completion.

[Factory Building Approvals in Selangor: From Planning Permission to CCC →](/guide/factory-building-approvals-selangor/)

Explainer

### How Long Does It Take to Build a Factory in Malaysia?

The stages of a factory project from brief to CCC, what causes delays and how your target start date shapes the plan. No promised durations.

[How Long Does It Take to Build a Factory in Malaysia? →](/guide/how-long-to-build-a-factory/)

Decision guide

### How Much Does It Cost to Build a Factory in Malaysia?

What drives factory cost in Malaysia: size, ground, piling, specification, M&E and floor loading, and how a quotation is built.

[How Much Does It Cost to Build a Factory in Malaysia? →](/guide/factory-construction-cost-malaysia/)

Decision guide

### How to Choose a Factory Contractor: Checks Before You Sign

Checks before appointing a factory contractor: CIDB registration, completed work, submissions and key contract terms.

[How to Choose a Factory Contractor: Checks Before You Sign →](/guide/how-to-choose-a-factory-contractor/)

Decision guide

### Steel Portal Frame vs Reinforced Concrete Factory

Compare steel portal frame and reinforced concrete factories on span, column-free space, speed, fire and durability, and when a hybrid fits.

[Steel Portal Frame vs Reinforced Concrete Factory →](/guide/steel-portal-frame-vs-reinforced-concrete/)

Explainer

### What Bomba, DOE and DOSH Need From a New Factory Building

Fire, environmental and workplace safety needs a new factory must plan for, and why to raise them in detailed engineering.

[What Bomba, DOE and DOSH Need From a New Factory Building →](/guide/bomba-doe-dosh-factory-requirements/)

Explainer

### What Is a CCC for a Factory and When Is It Issued?

What a CCC certifies for a factory, who issues it, the clearances behind it and why occupation waits for it.

[What Is a CCC for a Factory and When Is It Issued? →](/guide/what-is-ccc-for-factory/)

Decision guide

### What Is Usually Left Out of a Factory Construction Quotation?

Items often left out of factory quotations, such as submissions, consultants, machinery and utility connections, and what to ask.

[What Is Usually Left Out of a Factory Construction Quotation? →](/guide/factory-quotation-exclusions/)

## Warehouse Construction

Warehouses and storage buildings for logistics, trading and distribution companies, planned around storage height, floor loading and container access.

View service arrow\_forward

[/warehouse-construction/ →](/warehouse-construction/)

Decision guide

### Building Your Own Warehouse vs Renting Several Units

Goods across rented units? Compare split storage with your own warehouse: height, floor, loading, land and timing.

[Building Your Own Warehouse vs Renting Several Units →](/guide/own-warehouse-vs-renting-units/)

Explainer

### Loading Bays, Dock Levellers and Roller Shutters for Container Access

Plan container and lorry loading: bay layout and number, dock levellers vs ground level, shutter sizing and turning areas.

[Loading Bays, Dock Levellers and Roller Shutters for Container Access →](/guide/warehouse-loading-bays-dock-levellers/)

Explainer

### Warehouse Clear Height: Planning Storage Height and Racking Early

Work out the storage height you need: clear vs eaves height, racking, forklift reach and the effect on structure and cost.

[Warehouse Clear Height: Planning Storage Height and Racking Early →](/guide/warehouse-clear-height/)

Decision guide

### Warehouse Construction Cost in Malaysia: What Drives the Price

Warehouse-specific cost drivers: span, height, floor loading, loading bays, fire protection and site works, and what to put in your brief.

[Warehouse Construction Cost in Malaysia: What Drives the Price →](/guide/warehouse-construction-cost-malaysia/)

Explainer

### Warehouse Floor Loading for Racking and Forklifts

Why warehouse floor loading is set at design: power-floated slabs, racking point loads, forklifts, soil and piling.

[Warehouse Floor Loading for Racking and Forklifts →](/guide/warehouse-floor-loading/)

Explainer

### Warehouse Sprinkler and Fire Protection Requirements in Malaysia

When warehouses may need sprinklers, hose reels and hydrants, how Bomba reviews them, and how storage height matters.

[Warehouse Sprinkler and Fire Protection Requirements in Malaysia →](/guide/warehouse-sprinkler-requirements-malaysia/)

## Design and Build Factory

One contract covering design, engineering and construction for owners who have industrial land but no drawings yet.

View service arrow\_forward

[/design-and-build-factory/ →](/design-and-build-factory/)

Decision guide

### Design and Build vs Separate Architect and Contractor

Design and build vs separate architect and contractor: responsibility, coordination, timing and when each suits.

[Design and Build vs Separate Architect and Contractor →](/guide/design-and-build-vs-architect-and-contractor/)

Explainer

### Have Industrial Land but No Drawings? How to Start a Factory Project

Land but no drawings? What to gather, enquiring with details missing, and how a brief becomes a plan and design.

[Have Industrial Land but No Drawings? How to Start a Factory Project →](/guide/industrial-land-no-drawings/)

Decision guide

### How Progress Payments Work in a Factory Design and Build Contract

How factory design and build payments are staged: progress claims, retention, liquidated damages and what to check.

[How Progress Payments Work in a Factory Design and Build Contract →](/guide/factory-progress-payments/)

Explainer

### Keeping Control in Design and Build: Approvals, Specifications and Variations

Stay in control in design and build: design sign-off points, written specifications, variations and regular updates.

[Keeping Control in Design and Build: Approvals, Specifications and Variations →](/guide/design-and-build-control-variations/)

Explainer

### The Design and Build Process for a Factory, Step by Step

From brief to handover: plan and budget, design, engineering, quotation, approvals, construction and owner decisions.

[The Design and Build Process for a Factory, Step by Step →](/guide/design-and-build-process-factory/)

Explainer

### What a Design and Build Factory Contract Covers

Design and build and 'turnkey' explained: scope under one contract, consultants appointed and what stays with you.

[What a Design and Build Factory Contract Covers →](/guide/what-is-design-and-build-factory/)

## Factory Extension and Renovation

Extending or altering an existing factory or warehouse, including added floor area, mezzanines, office space and roof or floor upgrades.

View service arrow\_forward

[/factory-extension-renovation/ →](/factory-extension-renovation/)

Explainer

### Adding a Mezzanine Floor to a Factory

What adding a factory mezzanine involves: storage or office use, floor loading and structure checks, headroom and approval considerations.

[Adding a Mezzanine Floor to a Factory →](/guide/factory-mezzanine-floor/)

Decision guide

### Extend Your Factory or Build New?

Extend your factory or build new: land left on the lot, structural capacity, disruption and long-term fit.

[Extend Your Factory or Build New? →](/guide/extend-factory-or-build-new/)

Decision guide

### Extending a Factory While Production Continues

What to expect when building next to a running operation: phasing and site separation, safety and access, noise and dust, and communication.

[Extending a Factory While Production Continues →](/guide/factory-extension-during-production/)

Explainer

### Factory Extension Approvals and Regularising an Unapproved Extension

When a factory extension needs approval, how setbacks and plot ratio limit it, and regularising unapproved works.

[Factory Extension Approvals and Regularising an Unapproved Extension →](/guide/factory-extension-approval/)

Explainer

### Old Factory Roof Leaking or Floor Cracking: Repair, Replace or Rebuild?

Why factory roofs leak and floors crack, roof and insulation replacement, floor repair vs recast, and when to rebuild.

[Old Factory Roof Leaking or Floor Cracking: Repair, Replace or Rebuild? →](/guide/factory-roof-leak-floor-crack/)

Decision guide

### What Affects the Cost of a Factory Extension

Factory extension cost drivers: tying into the old structure, new foundations by old footings, operations and approvals.

[What Affects the Cost of a Factory Extension →](/guide/factory-extension-cost/)

## Detailed Engineering and M&E Works

Piping, mechanical and electrical design scoped to the building and its use, then installed by the same team.

View service arrow\_forward

[/detailed-engineering-me-works/ →](/detailed-engineering-me-works/)

Explainer

### Factory Power Supply: Three-Phase Supply, TNB Application and Substations

How power needs shape a factory: three-phase supply, load from equipment, when a substation is needed and TNB timing.

[Factory Power Supply: Three-Phase Supply, TNB Application and Substations →](/guide/factory-power-supply-tnb/)

Explainer

### Planning a Factory Building for an Overhead Crane

What a factory must allow for an overhead crane: crane loads on columns and beams, height and span, deciding before structural design.

[Planning a Factory Building for an Overhead Crane →](/guide/factory-overhead-crane-structure/)

Explainer

### What Detailed Engineering Covers in a Factory Project

Detailed engineering explained: piping, mechanical and electrical design, the drawings produced and why it comes first.

[What Detailed Engineering Covers in a Factory Project →](/guide/factory-detailed-engineering/)

Explainer

### Why Machinery and Specialist Equipment Must Be Decided Early

Machinery needs power, piping, drainage, ventilation and floor loading. Why late equipment decisions cause rework.

[Why Machinery and Specialist Equipment Must Be Decided Early →](/guide/decide-machinery-early/)

## Factory Construction Planning

A construction plan, engineering requirements and budget based on the site, the intended use and any existing drawings.

View service arrow\_forward

[/factory-construction-planning/ →](/factory-construction-planning/)

Decision guide

### Single-Storey or Multi-Storey Factory?

Build up or spread out on industrial land: plot ratio, goods movement and lifts, upstairs floor loading and structure.

[Single-Storey or Multi-Storey Factory? →](/guide/single-storey-vs-multi-storey-factory/)

Explainer

### What a Factory Feasibility Check Covers Before You Commit

What is checked before a factory design and budget are fixed: zoning, size allowed, soil, access, power and water.

[What a Factory Feasibility Check Covers Before You Commit →](/guide/factory-feasibility-check/)

Explainer

### What to Send Your Contractor to Plan a Factory Project

Prepare a useful factory enquiry: site and land area, size and floors, use, drawings, approvals, budget and start date.

[What to Send Your Contractor to Plan a Factory Project →](/guide/factory-project-brief/)

## Civil and Infrastructure Works

Site works such as earthworks, drainage, roads and hardstanding around the building.

View service arrow\_forward

[/civil-infrastructure-works/ →](/civil-infrastructure-works/)

Explainer

### Drainage and Retention Ponds on Industrial Land

The drainage provisions an industrial site may need: site drainage design, retention ponds, council requirements and flood and runoff risk.

[Drainage and Retention Ponds on Industrial Land →](/guide/industrial-land-drainage-retention-ponds/)

Explainer

### Factory Roads and Hardstanding for Lorries and Containers

Plan external areas for heavy vehicles: turning areas for container lorries, pavement build-up, links to loading bays and drainage falls.

[Factory Roads and Hardstanding for Lorries and Containers →](/guide/factory-roads-hardstanding/)

Decision guide

### Soil Investigation and Piling: How Ground Conditions Change Factory Cost

Why ground conditions shift a factory budget: soil investigation, piling, Klang's soft coastal clay and sloping sites.

[Soil Investigation and Piling: How Ground Conditions Change Factory Cost →](/guide/soil-investigation-piling-factory-cost/)

![](/images/misc/steel-portal-frame-factory-under-construction-in-s.webp)

Enquiries welcome with details missing

## Tell Us About Your Factory Project

Share your site, intended use and budget, even if some details are missing. Our engineers will review the brief and explain the next step.

architecture Request a Quotation

[/contact/ →](/contact/)

 

chat WhatsApp the Project Team

[https://wa.me/60192362343?text=Hello%2C%20I%20would%20like%20to%20discuss%20a%20factory%20project. →](https://wa.me/60192362343?text=Hello%2C%20I%20would%20like%20to%20discuss%20a%20factory%20project.)

 

call +603-9076 7341

[tel:+60390767341 →](tel:+60390767341)

-   check\_circleWritten inclusions and exclusions
-   check\_circleEngineer-led since 2002
-   check\_circleOne team, planning to handover