# Factory M&E Works Selangor | Factory Builder Malaysia

> Detailed engineering and M&E works for factories in Selangor. Piping, mechanical and electrical design scoped to your building and machinery, then installed.

URL: https://factorybuilder.my/detailed-engineering-me-works/

Since August 2002 · Reg. 588367-M task\_altEngineer-led (Ir.)

electrical\_services Detailed Engineering and M&E Works // Selangor and the Klang Valley

# Piping, Mechanical and Electrical Engineering for Factories

Last updated: 10 November 2026

Power, piping, drainage, ventilation and fire services designed around your building and your machinery, then installed by the same team. Decide early, avoid rework.

-   check\_circlePiping, mechanical and electrical design
-   check\_circlePower supply planning, including three-phase supply and substations
-   check\_circleProvision for machinery, ventilation and process drainage
-   check\_circleAllowance for overhead cranes in the structure

architecture Request a Quotation

[/contact/ →](/contact/)

 

chat WhatsApp the Project Team

[https://wa.me/60192362343?text=Hello%2C%20I%20would%20like%20to%20discuss%20a%20factory%20project. →](https://wa.me/60192362343?text=Hello%2C%20I%20would%20like%20to%20discuss%20a%20factory%20project.)

Quoted per project after the brief is reviewed. Call the office on 

+603-9076 7341

[tel:+60390767341 →](tel:+60390767341)

.

![Cable trays, piping and ducts installed inside a new factory](/images/misc/cable-trays-process-piping-and-ventilation-ducts-r.webp)

Every quotation lists Written scope

Inclusions

Exclusions

Responsibilities

-   history Building since 2002
-   engineering Led by a professional engineer (Ir.)
-   groups Engineering, PM and QS in one team
-   fact\_check Written inclusions and exclusions

## What Is Detailed Engineering for a Factory?

Wondering what happens between your approved plans and the day the first machine switches on? That’s where **detailed engineering** and M&E (mechanical and electrical) works come in.

**Detailed engineering** covers the piping, mechanical and electrical design of your factory, scoped to the building design and how it will be used. Raise machinery and specialist equipment at this stage, because power, piping, drainage, ventilation and floor loading all depend on it.

As part of our 

factory construction work in Selangor

[/ →](/)

, our team then installs the mechanical and electrical systems set out in the design. Deciding early avoids the rework that happens when equipment is chosen after the building is designed.

Here’s a simple habit that saves SME owners a lot of grief. Ask each machine supplier for a data sheet showing power rating, weight, and air, water and drainage needs before we finalise the drawings.

Our guide to 

what detailed engineering covers

[/guide/factory-detailed-engineering/ →](/guide/factory-detailed-engineering/)

 explains the drawings produced and where they sit in the project.

## Why Does Machinery Drive the Design?

A factory’s services follow its machines. A press line, an oven or a compressor each brings its own needs:

-   **Power.** Most factories need **three-phase supply**. Larger loads may need a **substation**. We size the **distribution board** and cabling from your equipment list. See 
    
    factory power supply and TNB
    
    [/guide/factory-power-supply-tnb/ →](/guide/factory-power-supply-tnb/)
    
    .
-   **Piping and drainage.** **Process piping**, compressed air, water and process drainage are routed before the slab is cast.
-   **Ventilation.** Heat, fumes and dust need extraction planned with the roof and walls.
-   **Floor loading.** Heavy machines need foundations or thickened slabs at the right places.

The power line is where most SME owners get caught out. According to TNB’s Electricity Supply Application Handbook (ESAH 3.1), the maximum demand of your factory decides the supply scheme:

| Maximum demand | What TNB’s handbook says |
| --- | --- |
| Up to 72 kVA (100A) | Three-phase, four-wire, 415V supply |
| Up to 350 kVA | A new 11/0.4kV substation may be needed, subject to a TNB system study |
| Above 350 kVA, under 1,000 kVA | A new 11/0.4kV substation is required |
| 1,000 kVA up to under 5,000 kVA | 11kV supply, with 11/0.4kV and/or 11kV substations |

Treat this table as a guide only, because TNB confirms the final scheme for your lot. It does show why we ask for your equipment list early. A few extra machines can push you over the 350 kVA line, and that changes your land use, budget and timeline.

When these are decided late, floors get cut, drains rerouted and cables upsized. Our guide on 

why machinery must be decided early

[/guide/decide-machinery-early/ →](/guide/decide-machinery-early/)

 explains what to prepare.

## When Do You Need to Plan for a Crane?

If your process uses an **overhead crane**, the building must be designed for it from the start. Crane loads go through the runway beams into the columns and foundations, and the hook height and span set the building height and grid.

The crane type also changes the structure. A top-running crane rides on rails on runway beams, which sit on the building columns or on separate crane columns. A 2026 design guide from PEB Steel notes that underslung cranes hang from the roof beams and suit lighter duty, typically 1 to 15 tonnes.

The crane itself comes from your specialist, but the structure is ours to get right. Tell us the crane type, capacity and span early, and we can size columns and foundations once instead of strengthening them later. See 

planning a factory building for an overhead crane

[/guide/factory-overhead-crane-structure/ →](/guide/factory-overhead-crane-structure/)

.

### Common Problems We Solve

-   **Not enough power** for new equipment, solved with early load assessment and **TNB power supply** planning.
-   **Late machinery changes** that would mean rework, avoided by asking for data sheets before design.
-   **Fire services added as an afterthought.** **Fire hydrants**, hose reels and the **sprinkler system** where required are designed in. Under the Uniform Building By-Laws 1984 (amended 2021), every building needs at least one hydrant within 30 metres of its entrance. Sprinkler systems follow MS 1910.
-   **Utility connections left unclear.** **Air Selangor water supply** and **Indah Water sewerage connection** responsibilities are written into the quotation. Air Selangor handles new development water applications through its eDPLAS system, so it helps to know who files what.

## How Are M&E Works Priced?

M&E is quoted after detailed engineering, as part of the project quotation. The main cost drivers are your power demand, the amount of process piping and drainage, ventilation needs and fire services.

We do not publish a price list. The quotation lists inclusions, exclusions and responsibilities, including who handles utility applications.

Ready to see what your machines mean for power, piping and fire services? Send us your equipment list, and we’ll show you how detailed engineering and M&E works fit your factory before any price is set.

report Sound familiar?

## Problems We Solve With Engineering and M&E

warning

### Machinery needs special power or piping

Heavy loads, compressed air, process water or extraction. We design the building services around your equipment list.

warning

### Equipment decided late

Changing machinery after the design is fixed means cutting floors, rerouting drains and upsizing cables. We ask for equipment details early.

warning

### Not enough power on site

Three-phase supply, a bigger connection or a substation may be needed. The TNB application sits in the project timeline, so we plan it early.

warning

### A crane the building was not designed for

Overhead cranes put large loads on columns and beams. The structure must be designed for them from the start.

request\_quote Quotation scope

## What Does a Engineering and M&E Quotation Cover?

M&E is where scope gaps hide most often, so we spell it out.

### add\_taskTypically included

-   Piping, mechanical and electrical design drawings
-   Power distribution, lighting and small power as designed
-   Process drainage and ventilation provisions as designed
-   Fire services agreed in detailed engineering
-   Installation, testing and commissioning of the designed systems

### blockUsually excluded

-   remove\_circleProduction machinery and its final connections unless listed
-   remove\_circleOverhead crane supply (by your specialist)
-   remove\_circleTNB, Air Selangor and Indah Water fees unless listed
-   remove\_circleItems marked provisional until equipment details are confirmed

### assignment\_indResponsibilities stated

-   person\_checkWho applies to TNB for supply and any substation
-   person\_checkWho provides machinery data sheets and when
-   person\_checkWho coordinates your equipment suppliers on site
-   person\_checkWho handles Bomba submissions for fire services

Exact items depend on your project. The quotation you receive lists them for your site and brief.

verified Why choose us

## Why Choose Factory Builder Malaysia for Engineering and M&E?

sync\_alt

### Design and install, one team

The engineers who design the M&E are part of the team that installs it, so nothing is lost between drawings and site.

engineering

### Engineer-led

The firm is led by a professional engineer, and M&E questions are answered while the design can still change.

precision\_manufacturing

### Built around your machinery

We design for your equipment list, not a generic layout.

bolt

### Power planned early

Three-phase supply, load and substation needs are assessed before the quotation.

local\_fire\_department

### Fire services with the design

Hydrants, hose reels and sprinklers where required are designed in, not added after.

fact\_check

### Written scope

The quotation lists the M&E inclusions, exclusions and who handles utility applications.

route The job process

## How Does Our Engineering and M&E Process Work?

Utility applications, especially TNB supply, have their own timing. We raise them early so they do not hold up handover.

1.  STEP 01 list\_alt
    
    ### Equipment and use
    
    You share the machinery list, power ratings, weights and process needs.
    
2.  STEP 02 bolt
    
    ### Load and services review
    
    We estimate power demand, piping, drainage and ventilation needs.
    
3.  STEP 03 engineering
    
    ### Detailed design
    
    Piping, mechanical and electrical drawings coordinated with the structure.
    
4.  STEP 04 request\_quote
    
    ### Quotation
    
    The M&E scope, exclusions and responsibilities are listed in writing.
    
5.  STEP 05 electrical\_services
    
    ### Install and commission
    
    Our team installs, tests and commissions the designed systems.
    

photo\_library On site

## Engineering and M&E Work in Progress

Typical stages of this kind of work. Click any photo to enlarge.

 

 

forum Client feedback

## What Our Factory Clients Say

Two of our factory clients have shared feedback on their projects. Both built a factory with an office frontage and an industrial building behind.

format\_quote

> Kelvin built a factory that combines an office frontage with an industrial building behind it. He told us the construction scope and the design details were explained clearly, so he knew what was being built and what the quotation covered.

KL Kelvin Lee Factory client · Factory with office frontage and industrial building behind

format\_quote

> Zahari's factory also pairs an office frontage with the production building at the back. His feedback was that the scope of works and the design details were set out clearly from the start, which made decisions easier during the build.

Z Zahari Factory client · Factory with office frontage and industrial building behind

help Questions owners ask

## Engineering and M&E FAQs

Still have a question?

Send what you have. Enquiries are welcome even if some details are missing.

Request a Quotation

[/contact/ →](/contact/)

### What does detailed engineering cover?

expand\_more

Detailed engineering is the piping, mechanical and electrical design of your factory, scoped to the building design and how it will be used. It covers power distribution and lighting, three-phase supply and any substation, water supply and drainage including process drainage, ventilation, and fire services such as hydrants, hose reels and sprinklers where required. It also covers provisions in the structure for heavy equipment such as overhead cranes. The output is a set of design drawings that the quotation and the installation are based on.

### Why does detailed engineering come before the quotation?

expand\_more

Because the quotation can only be accurate once the M&E is scoped. Power, piping, drainage, ventilation and floor loading all depend on your machinery and process. If they are guessed, the quotation is either padded or full of provisional sums, and changes later mean variations and rework. Doing the detailed engineering first lets us list exactly what is included and excluded, and lets you compare like with like.

### When should I decide my machinery?

expand\_more

As early as you can, ideally before detailed engineering starts. We need power ratings, weights, footprint, and any water, compressed air, drainage or extraction needs. Late changes can mean cutting floors, rerouting drains and upsizing cables, which costs time and money. Our guide on why machinery must be decided early explains what to prepare.

### Do you supply production machinery?

expand\_more

No. Machinery stays with you or your specialist supplier. We design the building and its services around your equipment, and the quotation states this clearly.

### Do I need a substation for my factory?

expand\_more

It depends on your total power demand. We estimate the load from your equipment list and advise whether a larger connection or a substation is needed. The TNB application has its own timing, so we raise it early.

### Can you design for an overhead crane?

expand\_more

Yes. The columns, beams and foundations must be designed for crane loads, height and span from the start. The crane itself is supplied by your specialist. A crane can only be added later if the structure was designed for it.

### Who installs the M&E systems?

expand\_more

The same team. We install, test and commission the mechanical and electrical systems set out in the detailed engineering.

### Do you handle water and sewerage connections?

expand\_more

We design the internal systems and coordinate the Air Selangor water supply and Indah Water sewerage connections. Who applies and pays for each is written into the quotation.

### Does every factory need sprinklers?

expand\_more

No. Fire protection depends on the use, size and storage. Requirements are confirmed during detailed engineering and reviewed by Bomba.

menu\_book Guides

## Detailed Engineering and M&E Works Guides

Plain answers to the questions owners ask before they commit.

All guides arrow\_forward

[/guide/ →](/guide/)

Explainer

### Factory Power Supply: Three-Phase Supply, TNB Application and Substations

How power needs shape a factory: three-phase supply, load from equipment, when a substation is needed and TNB timing.

Read guide arrow\_forward

[Factory Power Supply: Three-Phase Supply, TNB Application and Substations →](/guide/factory-power-supply-tnb/)

Explainer

### Planning a Factory Building for an Overhead Crane

What a factory must allow for an overhead crane: crane loads on columns and beams, height and span, deciding before structural design.

Read guide arrow\_forward

[Planning a Factory Building for an Overhead Crane →](/guide/factory-overhead-crane-structure/)

Explainer

### What Detailed Engineering Covers in a Factory Project

Detailed engineering explained: piping, mechanical and electrical design, the drawings produced and why it comes first.

Read guide arrow\_forward

[What Detailed Engineering Covers in a Factory Project →](/guide/factory-detailed-engineering/)

Explainer

### Why Machinery and Specialist Equipment Must Be Decided Early

Machinery needs power, piping, drainage, ventilation and floor loading. Why late equipment decisions cause rework.

Read guide arrow\_forward

[Why Machinery and Specialist Equipment Must Be Decided Early →](/guide/decide-machinery-early/)

hub Also from the same team

## Related Services

architecture

### Design and Build Factory

One contract covering design, engineering and construction for owners who have industrial land but no drawings yet.

View service arrow\_forward

[Design and Build Factory →](/design-and-build-factory/)

assignment

### Factory Construction Planning

A construction plan, engineering requirements and budget based on the site, the intended use and any existing drawings.

View service arrow\_forward

[Factory Construction Planning →](/factory-construction-planning/)

warehouse

### Warehouse Construction

Warehouses and storage buildings for logistics, trading and distribution companies, planned around storage height, floor loading and container access.

View service arrow\_forward

[Warehouse Construction →](/warehouse-construction/)

![](/images/misc/steel-portal-frame-factory-under-construction-in-s.webp)

Enquiries welcome with details missing

## Ready to Talk About Engineering and M&E?

Send your brief for detailed engineering and m&e works. We review it, set out the plan and issue a quotation with inclusions, exclusions and responsibilities.

architecture Request a Quotation

[/contact/ →](/contact/)

 

chat WhatsApp the Project Team

[https://wa.me/60192362343?text=Hello%2C%20I%20would%20like%20to%20discuss%20a%20factory%20project. →](https://wa.me/60192362343?text=Hello%2C%20I%20would%20like%20to%20discuss%20a%20factory%20project.)

 

call +603-9076 7341

[tel:+60390767341 →](tel:+60390767341)

-   check\_circleWritten inclusions and exclusions
-   check\_circleEngineer-led since 2002
-   check\_circleOne team, planning to handover